Tullow Oil

The project period was from October 2013 to December 2014. And the value of the works was USD. 6 Million.

Project Design was done by UK based consultant. As the local MEP consultants, we provided support during the construction phase of the project. We were required to provide coordination of all MEP services as well as local input to ensure that the designs complied with local standards. Unique to this project was a significant liaising with local contractors, landlord and utilities to ensure design intent was met. The designs required very detailed coordination to achieve design intent which we provided.